01 / PROJECT OVERVIEW
The civil work package.
The XRBIA project reference lists Kean Constructions as the client and describes a civil package combining AAC blockwork, toilet ledge walls and loft shuttering and casting.
The documented blockwork includes 100, 150 and 200 mm thicknesses. Alongside the masonry, the listed loft works bring formwork and concrete casting into the same project reference, giving the package a broader civil execution scope.
The package combines wall-building work with ledge and loft elements. AAC masonry forms the walls, while loft shuttering creates the form needed for the associated concrete casting. These are distinct work categories within the combined civil scope.
02 / SCOPE OF WORK
What the scope covers.
AAC blockwork
Civil AAC masonry in the listed 100, 150 and 200 mm wall thicknesses. The original reference describes an end-to-end blockwork package.
Toilet ledge wall work
Ledge wall construction included alongside the general AAC masonry scope, as recorded in the original project description.
Loft shuttering & casting
Shuttering provides the form for the loft element; casting is the associated concrete placement. Both activities are listed in this project reference.
Execution focus
A combined wall-building and loft works package covering masonry, ledges, shuttering and casting.